Skip to Banner
Brightline
  1. Media
  2. Advisories
Construction workers GES onsite

Advisories

Advisories

Engineering & Construction Advisories

 

Brightline West is conducting ongoing field investigation work in Nevada and Southern California within the proposed rail corridor within Interstate 15 right-of-way.

 

Field investigation work includes geotechnical borings and samplings, utility potholing and land surveying. Work is taking place primarily during daytime hours, with some work at night to minimize disruption to traffic. In some instances, short-term closures of freeway shoulders will be required. All work is being done in compliance with applicable environmental regulations and in coordination with the Nevada Department of Transportation and Caltrans.

 

Regular updates to project areas will be provided below. Motorists should proceed with extra caution through work zones and adhere to posted detour signs, speed limits and other signage.

Updates to Field Investigation Work

October 28, 2024 | UPDATE: NEW LOCATIONS FOR BRIGHTLINE WEST FIELD INVESTIGATION WORK IN SOUTHERN NEVADA

 

October 28, 2024 | UPDATE: NEW LOCATIONS FOR BRIGHTLINE WEST FIELD INVESTIGATION WORK IN SOUTHERN CALIFORNIA

 

October 21, 2024 | UPDATE: NEW LOCATIONS FOR BRIGHTLINE WEST FIELD INVESTIGATION WORK IN SOUTHERN NEVADA

 

October 21, 2024 | UPDATE: NEW LOCATIONS FOR BRIGHTLINE WEST FIELD INVESTIGATION WORK IN SOUTHERN CALIFORNIA

 

October 14, 2024 | UPDATE: NEW LOCATIONS FOR BRIGHTLINE WEST FIELD INVESTIGATION WORK IN SOUTHERN NEVADA

 

October 14, 2024 | UPDATE: NEW LOCATIONS FOR BRIGHTLINE WEST FIELD INVESTIGATION WORK IN SOUTHERN CALIFORNIA

 

 

Media Resources

  • Media Kit

    Download
    • Careers
    • People and Culture
    • FAQ
    • Press Releases
    • Construction Advisories
    • Media Kit

      Contact Us

    • Press@brightlinewest.com
    • Outreach@brightlinewest.com

    © Brightline West 2025. All Rights Reserved
    • Terms of Service
    • Privacy Policy
    • Accessibility